Skip to content

Switchboard upgrades

Switchboard upgrades across Sydney

Older switchboards, ceramic fuses and tired meter boxes replaced with a modern board, safety switch protection on every circuit, and a Certificate of Compliance when we finish. From $1,500.

Clover switchboard upgrade with modern circuit protection

Why boards get upgraded

Most of the switchboards we replace were installed decades ago, when a house ran a fridge, a few lights and a stove. Today the same board is asked to carry ducted equipment, induction cooktops, pool pumps, solar inverters and EV chargers. Some of those boards still run on ceramic rewirable fuses with no safety switch anywhere.

People usually call us for one of three reasons. The switchboard keeps tripping and they want to know why. They are adding solar or an EV charger and have been told the board is not up to it. Or they have bought an older home and want the safety switch installation done before they move in.

Whatever the reason, the job starts the same way: a free on-site inspection, with the board opened up so we can see what is actually there.

What a modern board gives you

RCBOs on every circuit

Each circuit gets its own combined safety switch and breaker, so a fault turns off one circuit, not the whole house.

Correct labelling

Every circuit is identified and labelled clearly, so you, or the next electrician, know exactly what each breaker controls.

Surge protection where specified

A surge protection device can be fitted to the new board where you ask for it or the job calls for it.

Capacity for modern load

Room and capacity for the circuits a modern home needs, including solar, EV charging and future additions.

Asbestos backing boards

Many Sydney meter boxes built before the late 1980s have an asbestos cement backing panel behind the meter and fuses. It is a common find in the older brick and fibro homes across the Hills District, the north shore and the inner west.

An asbestos switchboard panel is generally safe when it is undisturbed. It becomes a problem when it is drilled, cut or broken, which is exactly what an upgrade would normally involve.

We identify asbestos backing during the free inspection. If it is present, it changes how the job is done and how it is priced, and it is handled in line with the NSW Work Health and Safety Regulation 2017. You will know about it, in writing, before you agree to anything.

Mains, metering and the network connection

Work on consumer mains, metering and the network connection must be done by an accredited Level 2 ASP. Where your job needs it, we coordinate a Level 2 ASP and manage it as part of the job.

Many switchboard upgrades do not touch any of these. The free inspection tells us whether yours does, and the quote will say so.

What happens on the day

  1. 1We confirm the scope with you on site, against the written quote.
  2. 2The board is isolated and the power goes off. The electrician will tell you what to expect once they have seen the job.
  3. 3The old board is removed and the new board is installed, with RCBOs and every circuit labelled.
  4. 4Every circuit is tested before the power is restored.
  5. 5You receive a Certificate of Compliance for Electrical Work (CCEW).
How much does a switchboard upgrade cost?

Our warranty

  • Lifetime workmanship warranty for as long as you own the property.
  • A free re-inspection at 12 months.
  • Parts carry their manufacturer's warranty.

Simple from start to finish

How it works

  1. 01

    Free on-site inspection

    We look at what is actually there and discuss what you need. For switchboards, you receive a written report whether or not you go ahead.

  2. 02

    A fixed written quote

    The scope and price are set out before work starts. You choose what goes ahead, with no work done without your approval.

  3. 03

    Installed, tested and certified

    A licensed electrician completes and tests the work. You receive a Certificate of Compliance for Electrical Work where required.

Common questions

Book a free switchboard inspection

Tell us a little about the job. A photo of your board helps us give you an accurate quote.

Optional, and the fastest way to get an accurate quote. A photo of your existing board tells us most of what we need to know.

No obligation. We will get back to you during business hours.